Construction works included load-bearing blockwork on a foundation of mini-piles, installation of new structural steel work, formation of a new mezzanine level, offices, a car showroom and a workshop area. The existing cladding was removed and replaced with a new glazing system.
A new drainage system was installed throughout the building and connected to the existing system at the site boundary.
All existing services including the sprinkler systems were removed and replaced with new systems.